Call Us At 800-394-5266

Pantex Advanced Fabrication Facility

  • Design-Build 18,000 sq ft pre-engineered metal building for an Advanced Fabrication Facility at the Pantex plant on a brownfield site
  • Clear-span high-bay manufacturing space; special foundations to accommodate equipment; additive manufacturing, water jet, post processing, and inspection rooms; a tool crib; storage room; office space to accommodate 25 people; and various support spaces.
  • 20,000-pound forklift loading capabilities, two 10-foot forklift aisles along the sides of the manufacturing space

Project Title

Pantex Advanced Fabrication Facility

Location

Amarillo, Texas

Building Use

Light Industrial, Government

Square Footage

18,000 sq ft

Project Type

Design-Build